Version 3.3.2

Release Dates


April 10, 2007 and June 12, 2007

About Version 3.3.2


A full installation of Drainage Design Management System for Windows (DDMSW) 3.3.2 is required. The previous versions (including 1.8, 1.5 and 2.1.0) cannot be upgraded to DDMSW 3.3.2. DDMSW 3.3.2 can co-exist with the previous versions (including 1.5, 1.8 and 2.1.0).

This software package contains the draft versions of Flood Control District of Maricopa County Hydrology (PDF) and Hydraulics (PDF) Manuals.

Note: The difference between the June 12, 2007 version and the April 10, 2007 version is that the June 12, 2007 program includes the June 12, 2007 version of MCUHP1. If you installed the DDMSW 3.3.2 package before June 12, 2007 from one of the four training sessions at Flood Control District of Maricopa County (October 24, 2006, November 7, 2006, April 5, 2007, May 14, 2007), you will need to download the June 12, 2007 version of MCUHP1.

The June 12, 2007 version of MCUHP1 supersedes the April 2007 MCUHP1 CD.

If you want to know the relationship between the original SCS soil survey map units and the soil IDs currently used in DDMSW, you may need to reference the Soil ID Cross Reference Table (XLS).

Installation Procedures for DDSMW 3.3.2


  1. Right-click the Installation File (ZIP) and choose "Save Target As" to download the self-extracting file FCDMC2INSTALL.EXE to a new folder (for example, c:\ddms332download) on your PC.
  2. Double-click on FCDMC2INSTALL.EXE to self-extract files in the new folder (for example, c:\ddmsw332download).
  3. Locate and double-click Setup.exe in the new folder to install DDMSW 3.3.2.
  4. Follow the installation process to finish the installation (you can install it to a folder other than the default folder C:\FCDMC\ST during the installation process).

Questions


If you have any questions, please email Dr. Carlos Carriaga.