Future Construction Projects

Total Projects: 2

Project Name: Durango Regional Conveyance Channel and Basins (DRCC) - Phase I
Project Manager: Bobbie Ohler BAO@mail.maricopa.gov  -  (602) 506-2943
Range: $6,000,000 - $8,000,000
Target Advertisement Date: 4/3/2009
Message:
Description: The 75th Avenue Storm Drain and Durango Regional Conveyance Channel (DRCC) Project will provide an interim regional outfall for the City of Phoenix and is the first phase of the DRCC Project. The area North of the Union Pacific Railroad has flood hazards. The Project improvements will reduce the flooding hazards and remove approximately 71 structures from a identified floodplain. The Project was requested by the City of Phoenix for inclusion into the District's Capital Improvement Program in FY 2001/2002. The City is the lead for design of both projects (Storm Drain and DRCC) of the Project. The design is nearing completion. The City is the lead for construction of the storm drain. Phase 1 of the storm drain is under construction. The District is the lead for construction of the DRCC, which is expected to go to construction in January 2007. The construction project includes excavation of a basin and channel (approx. 680,000 cy), installation of 2,700 ft of 66" reinforced concrete pipe, construction of a reinforced concrete box culvert and construction of a reinforced concrete drop structure.
Project Name: McDowell Road Basin & Storm Drain
Project Manager: Scott Vogel CSV@mail.maricopa.gov  -  (602) 506-4771
Range: $5,000,000 - $6,000,000
Target Advertisement Date: 12/31/2009
Message: Advertising date to be determined.
Description: The project is located in and adjacent to McDowell Road between Sossaman Road and Hawes Road, in the City of Mesa and unincorporated Maricopa County. Principal construction features for the project include: clearing and grubbing, removal of existing headwalls, channel excavation, fine grading, construction of a new large diameter rubber gasket reinforced concrete storm drain, concrete junction structures, box culverts, cross culverts, waterline vertical realignments, sanitary sewer replacement, detention basin, landscape enhancement, irrigation, driveway and pavement replacement and placement of fill material.