|
|
Future Consulting Projects
|
Total Projects: 1
| Project Name: |
Pinnacle Peak Road Channel (83rd - 107th Ave.) Final Design |
| Project Manager: |
Don Rerick DJR@mail.maricopa.gov
- (602) 506-4878 |
| Range: |
$800,000 - $1,200,000 |
| Target
Advertisement Date: |
12/31/2008 |
| Message: |
Estimated construction project: $12,000,000.
The project is currently "On Hold" until further notice.
|
| Description: |
Roadway and flood control improvements along Pinnacle Peak Road from 87th Avenue to the Agua Fria River, utilizing the Glendale/Peoria Area Drain Master Plan Update alternatives. The project would combine flood control and roadway drainage requirements to minimize impacts to the project corridor while achieving increased benefit to both projects at reduced cost. |
|
|
|
|