Total Future Projects Currently Published: 1
|
|
|
Project Name: |
Loop 303 Outfall Drainage System |
|
Project Manager: |
Mike Duncan (602) 506 4732 MWD@mail.maricopa.gov |
|
Range: |
15,000,000.00 – 25,000,000.00 |
|
Target Advertisement Date: |
May, 2013
|
|
Message: |
|
|
Description: |
The project includes drainage excavation, concrete lined channel, box culverts, landscaping, pipes, fencing, and irrigation pipes, gates, and ditches.
|
|
|
|