Rittenhouse Basin

Public Meetings
Currently there are no public meetings scheduled for this project.

Past Public Meetings
• 9/17/2002

Project Contact: Scott Vogel - csv@mail.maricopa.gov
Region: SE
District: 1 - Denny Barney
View Map: click here
Description:

The District completed a study addressing the capacity of its East Maricopa Floodway (EMF) that identified several drainage and flooding problems along the EMF. The EMF's design capacity of 8,000 cubic feet per second (cfs) would be unable to support existing condition 100-year flows of 16,000 cfs. The study proposed to mitigate the capacity problem by constructing two large, off-line detention basins and associated channel and structure improvements: the Rittenhouse and Chandler Heights basins.

The Rittenhouse Basin mitigates flows from the upstream EMF, while the Chandler Heights Basin would mitigate flows from both the Sonoqui and Queen Creek Washes.

The District was the lead agency for all design and construction-related tasks. Both basin sites are expected to be utilized by the Town of Gilbert for park facilities upon completion of construction, and following rights-of-way purchase by the Town.

Status:

Basin construction was completed in 2010. The Town of Gilbert has purchased a recreational use easement over the basin, intended for future park use.