Does the MCESD sign the cover page of the design drawings?
The cover page of the design drawings is signed by the Subdivision, Infrastructure and Planning Program staff for projects which involve the construction of or modification to a facility or system and require an Approval to Construct.

An approval area for the MCESD should be provided on the cover page with space reserved for the following information:
- Approval By: (Signature)
- Approval Date:
- Project Number:

For more information, please call 602-506-1058.